DCX Cooling Pack + Thermasafe R
    search
    • DCX Cooling Pack + Thermasafe R
    • DCX Cooling Pack + Thermasafe R
    • DCX Cooling Pack + Thermasafe R
    • DCX Cooling Pack + Thermasafe R
    DCX Cooling Pack + Thermasafe R
    DCX Cooling Pack + Thermasafe R DCX Cooling Pack + Thermasafe R DCX Cooling Pack + Thermasafe R DCX Cooling Pack + Thermasafe R

    DCX Cooling Pack + Thermasafe R

    €11,263.20
    Tax included

    The DCX Cooling Pack This immersion bin is designed to support all your mining hardware needs, from GPU rigs to ASIC miners. Accommodating up to 96 GPUs or 8-15 ASIC miners in a single enclosure. for optimal oil cooling.

    Clearance sale with code DCX8X

      Décibel:   55-67dB

       WATT:   870W

    The DCX Cooling Pack includes as a whole

    - A box (for the immersion of Asics or Rigs)

    - An electrical panel (for Asic or Rigs)

    - A radiator (to cool the liquid)

    - All the pipes (for the connection of the different sets)

    - 250L of thermasafe R (dielectric oil)

    payment by credit card   payment by transfer payment by crypto  delivery by DHL FEDEX

    Quantity
    In stock

    DESCRIPTION

    Compatible with all crypto mining hardware

    The mining immersion case is capable of supporting crypto mining hardware, including GPU rigs and ASIC miners. Each universal immersion mining case will accommodate 8 to 16 GPU rigs with up to 12 GPUs each, or 15 new Whatsminer M20/30/31 series ASIC miners, or 8 x S17 or S19 Antminers. This translates to 96 GPUs or 15-18 ASIC miners in an immersion mining enclosure. Stacking cases at 2/3 levels will effect 288 GPUs or 45 miners in less than 1 square meter. It's the best you can get!

     

    Performance increase. Reduced bills

    The numbers are impressive, 30% lower electricity bills with a PUE of 1.05, most fans can be removed, and the system cools miners for a long time with PSUs. Liquid cooling systems allow overclocking and fine-tuning with custom firmware that produces 20% more hash with hardware and software optimization. Plus, most users get up to 10% more share through stability

    Quiet and discreet mining

    An ASIC miner generates 75 dB noise day and night. With a small farm of 2-4 rigs or ASIC miners, this is unbearable 24/7. A specific location is required. Juveniles should be spaced out and placed in a relatively cool place. The air must be filtered and ventilated, which means expenses for fans, air conditioning, location, filters. With our liquid immersion cooling, you can operate quietly wherever you want or in the area with the most suitable power. Placing 72 GPUs or 18 ASIC miners in the box with dimensions less than 70x60x60 solves all problems. As simple as that.

     

    Sustainable heat reuse

     

    Durability is key. The proprietary engineering fluid extracts 100% of the heat from the ICT or Blockchain infrastructure. Hot liquid 60°C / 140°F can be # reused for local community or office heating. This mobile system can be located near solar or hydroelectric or biomass power plants to utilize excess energy or waste/biomass and power infrastructure with a PUE close to 1.01 and a virtually zero carbon footprint.

    Work anywhere!

    Our systems are designed and built to operate in remote locations close to energy sources such as solar power plants, wind turbines or hydroelectric plants. Immersion cooling completely isolates the equipment from the outside air. The system works flawlessly even in a hot climate, with high ambient temperatures being a real alternative for remote mining. We have eliminated all mechanical parts requiring frequent replacement. Only active subsystems: pumps, have an industrial grade MTBF.

     

    Access to cheap or surplus energy

     

    From the universal immersion mining case to the immersion mining rack to the mobile mining container – you can operate in remote locations and use low-cost energy directly at the source. This allows us to position or migrate your mining farm to regions with a competitive supply or overcapacity of energy – negotiate smartly with green energy providers around the world: solar, wind or hydro power plants.

    State-of-the-art liquid immersion cooling

    We have designed, developed and tested a radically new self-regulating liquid cooling system specifically designed for the blockchain mining industry. This patent-pending cooling solution achieves class-leading energy efficiency with consumption of only ~1% of total system energy consumption.

     

    Fewer repairs, more uptime!

     

    The technical fluid is compatible with 95% of the mining systems for which we have been able to verify the compatibility of the materials. This system will ensure improved MTBF throughout the life cycle of the mining infrastructure. Systems immersed in liquid are completely protected from high temperatures, humidity, dust and vibrations. All of this results in an immediate increase in miner MTBF and the elimination of a majority of scheduled maintenance.

    Plug and Mine

    Ready to use, delivered with everything needed, the “plug and mine” solution is suitable for everyone who goes pro with 2-3-4 miners or mining rigs. The immersion mining case is also the component of scalable solutions with 10-20-40 cases in our custom racks. Everything is included, whether it's a single immersion case or a complete rack system. It will work perfectly even in a hot climate with a high ambient temperature.

     

    Unprecedented density and mobility!

     

    The MMU / MCU can be equipped with a maximum of 72 universal mining boxes per immersion. Each universal case can accommodate 6 GPU rigs with up to 12 GPUs each, or 25 S9 miners or 8 X S17/S19 standard. This provides the highest density in the industry without losing ICO compliance – you can still transport your container wherever you need it.

    SPECIFICATION

    In the Pack there are:

     

    - DCX Immersion Mining Chamber

    Immersion mining enclosure with hydraulic fittings, 88 l/min continuous duty pump (270 W |

    40 dB) and 110 kW brazed plate heat exchanger for double loop systems or to

    connect to the house/facility heating or cooling loop. Efficiency: 40kW

    heat transfer with 40°C inlet and 60-65°C outlet

     

    - Monitored rack power distribution PDU 220V 1 phase (electrical panel)

    Remotely Monitored IPDU Immersion Chamber with 38.4 kW Electrical Load | Voltage

    single phase 220-240V, 160 Amps. Equipped with 12 C13 ports with 2 x overcurrent protection

    80 amps. The PDU has a local LCD display for quick overview and remote monitoring via

    an Ethernet connection.

     

    ICP40 PRO - 40 kW integrated cooling and pumping system

    ICP40 PRO with three-phase system of 50/60Hz industrial fans. System of

    integrated cooling and pumping with continuous duty electronic pump of 160 l/min maximum and

    dry liquid-air cooler. 1.4x0.7x0.4m dimensions that provide over 43kW of heat transfer

    in an ambient temperature of 35°C. Without the fan controller. Two fans 55-67 dB, 50

    cm in diameter. Maximum power 600W.

     

    - 250L ThermaSafe R™ Liquid

    #DCX/PACK+TSR

    Specific References

    New

    Download

    manuel F2POOL

    Download (1.28MB)

    manuel DCX Immersion Cooling

    Download (3.97MB)

    manuel Wallet

    Download (2.36MB)

    Les asics de minage vert

    Download (298.8KB)

    Traitement et temps d'expédition

    Toutes les commandes seront expédiées 72 heures maximum à partir de notre entrepôt Mining Delta France ou Mining Delta Chine, en cas de commande en gros, nous pouvons prendre un jour ou deux pour expédier le produit via (DHL Express / FEDEX Express) après le paiement intégral de la commande. La livraison internationale prend environ 5 à 14 jours ouvrables.

    Emballage

    Chaque machine (Asics) comprend un bloc d'alimentation. Et emballage d'origine de la société.

    Processing and shipping time

    All orders will be shipped 72 hours maximum from our Mining Delta France or Mining Delta China warehouse, in case of bulk order, we may take a day or two to ship the product via (DHL Express / FEDEX Express) after payment is cleared. full order. International delivery takes approximately 5-14 business days.

    Packaging

    Each machine (Asics) includes a power supply. And the original packaging of the company.

    Tiempo de procesamiento y envío

    Todos los pedidos se enviarán 72 horas como máximo desde nuestro almacén Mining Delta France o Mining Delta China, en caso de pedido a granel, podemos tardar uno o dos días en enviar el producto a través de (DHL Express / FEDEX Express) después del pago completo del pedido. La entrega internacional tarda entre 5 y 14 días hábiles.

    Embalaje

    Cada máquina (Asics) incluye una fuente de alimentación. Y embalaje original de la empresa.

    Bearbeitungs- und Versandzeiten

    Alle Bestellungen werden innerhalb von 72 Stunden von unserem Mining Delta France oder Mining Delta China Lager aus versandt. Bei Großbestellungen kann es ein oder zwei Tage dauern, bis das Produkt per (DHL Express / FEDEX Express) versandt wird, nachdem die Zahlung für die gesamte Bestellung eingegangen ist . Internationale Lieferung dauert etwa 5-14 Werktage.

    Verpackung

    Jede Maschine (Asics) enthält ein Netzteil. und original Firmenverpackung.

    DHL  Fedex

    Notre paiement sécurisé

    Avec le systéme de sécurité est de cryptage SSL 

    Utilisation de Visa / Mastercard / Maestro / Ledger / Crédit Agricole / Revolut Business

    • La sécurisation du service de carte bancaire avec Visa secure, et Mastercard ID Check avec la banque Crédit Agricole / Revolut Business.
    • La sécurisation de paiement a distance avec la banque Crédit Agricole.
    • La sécurisation de vos crypto-actifs (crypto-monnaie) avec la plateforme Ledger. Nous acceptons BITCOIN, ETHEREUM, USDT TRX.

    Our secure payment

    With the security system is SSL encryption

    Use of Visa / Mastercard / Maestro / Ledger / Crédit Agricole / Revolut Business

    • Securing the credit card service with Visa secure, Mastercard ID Check with the Crédit Agricole / Revolut Business bank.
    • Remote payment security with the Crédit Agricole bank.
    • Securing your crypto-assets (crypto-currency) with the Ledger platform. We accept BITCOIN, ETHEREUM, USDT TRX.

    Nuestro pago seguro

    Con el sistema de seguridad es el cifrado SSL

    Uso de Visa / Mastercard / Maestro / Ledger / Crédit Agricole / Revolut Business

    • Asegurar el servicio de tarjeta de crédito con Visa secure, y Mastercard ID Check con el banco Crédit Agricole / Revolut Business.
    • Pago seguro de forma remota con el banco crédit Agricole.
    • Asegure sus criptoactivos (criptomonedas) con la plataforma Ledger. Aceptamos BITCOIN, ETHEREUM, USDT TRX.

    Unsere sichere Zahlung

    Bei dem Sicherheitssystem handelt es sich um eine SSL-Verschlüsselung

    Verwendung von Visa / Mastercard / Maestro / Ledger / Crédit Agricole / Revolut Business

    • Sicherung des Bankkartendienstes mit Visa Secure und Mastercard ID Check mit Crédit Agricole / Revolut Business Bank.
    • Sicherheit bei der Fernzahlung mit der Bank Crédit Agricole.
    • Sicherung Ihrer Krypto-Assets (Kryptowährung) mit der Ledger-Plattform. Wir akzeptieren BITCOIN, ETHEREUM, USDT TRX.

    visa master cardCrédit Agricole  ledgerbitcoin ethereum USDT TRON

     Reviews (0) - Review moderation  


    There are no reviews for this product yet.

    Related articles on blog

    1
    DCX Cooling Pack + Thermasafe R

    DCX Cooling Pack + Thermasafe R

    €11,263.20
    Found something you like? Don't let this opportunity slip away! Add your viewed products to your cart with just one click