
Filling set
Pressure pump with pressure gauge and all the necessary fittings for easy filling and the interview.
The H200-S-3U 200 kW cabinet is specially designed for liquid cooling of 14 ASICs of the Antminer S21E XP Hydro type. It is equipped, at the rear, with pipes for connecting the ASICs to the liquid cooling circuit. The H200-S-3U cabinet must be coupled with the H200-CDU cabinet, which serves as a reservoir, pump and liquid temperature management system.
FROID: 200Kw
WATT: 3500W
* Power consumption data may vary by +/- 5%.
Introducing the H200-S-3U watercooling cabinet 200Kw the ultimate solution for liquid cooling of the Antminer S21E XP Hydro asic. Equipped with pipes at the back to connect the ASICs to the liquid cooling circuit, this cooling system is designed to keep your mining equipment running at maximum efficiency with its capacity to accommodate 14 Asics Antminer S21E XP Hydro. The pump, reservoir and all pipes ensure a seamless and reliable installation you will need three-phase (380v/420v) to power the cabinet for proper operation. With the H200-S-3U watercooling cabinet 200Kw you can be sure that your mining operation is in good hands. Invest in this professional-grade cooling system today and take your mining operation to the next level.
The H200-S-3U Cabinet for liquid cooling with a cooling capacity of 200Kw and a power consumption of 2200W which represents for the asic a reduction in power consumption and the power to increase the hashrate of your asics (custom firmware change).
This product has a 12-month manufacturer warranty for new asics or 14 days for used asics. The power supply is included in the price and tested before shipping.
Brand | Mining Delta FAB |
---|---|
Series | H200-S-3U |
Cooling power | 200Kw |
Power consumption | 3500w |
Reservoir | included |
Weight | 800Kg |
Decibels | 50dB |
Dimensions | L 1600mm l 1050mm H 2100mm |
The price of the pre-order could be different at the time of delivery, the manufacturer may increase the price before delivery, you will be liable for the increase to receive your minors.
Regarding the highly variable and demanded market, the price could be different every day for minors in stock. It is therefore possible that the price of the miner has increased when we receive your payment and need to refund the order to you.
Need to see the profitability of Asics Mineur Antminer S21E XP Hydro 860TH/s in real time for this product? There are precise calculators for each miner on the web. You can check the profitability of the Asics Mineur Antminer S21E XP Hydro 860TH/s here.
Our sales teams are mobilizing every day to be the lowest in the market for cryptocurrency mining hardware. By subscribing to our newsletter, the prices of the components being evolutionary, we update our prices with each evolution. You automatically receive all new products added, and current promotions.
All the products we sell in our Mining Delta shop are guaranteed. The manufacturer's warranty is 12 months for new asics or 14 days for used asics. Power supply is included in the price and tested before shipping. Then if you encounter a problem with a product that is defective or otherwise, we let you contact us to notify us so that we can take the necessary action. If the product complies with the warranty conditions, then it is returned to the manufacturer for repair.
Our offices are open Monday to Friday from 9:00 a.m. to 6:00 p.m. You can reach us by e-mail at contact@miningdelta.com or directly on our contact form via our contact page. We answer your questions !
Toutes les commandes seront expédiées 72 heures maximum à partir de notre entrepôt Mining Delta France ou Mining Delta Chine, en cas de commande en gros, nous pouvons prendre un jour ou deux pour expédier le produit via (DHL Express / FEDEX Express) après le paiement intégral de la commande. La livraison internationale prend environ 5 à 14 jours ouvrables.
Chaque machine (Asics) comprend un bloc d'alimentation. Et emballage d'origine de la société.
Processing and shipping time
All orders will be shipped 72 hours maximum from our Mining Delta France or Mining Delta China warehouse, in case of bulk order, we may take a day or two to ship the product via (DHL Express / FEDEX Express) after payment is cleared. full order. International delivery takes approximately 5-14 business days.
Packaging
Each machine (Asics) includes a power supply. And the original packaging of the company.
Todos los pedidos se enviarán 72 horas como máximo desde nuestro almacén Mining Delta France o Mining Delta China, en caso de pedido a granel, podemos tardar uno o dos días en enviar el producto a través de (DHL Express / FEDEX Express) después del pago completo del pedido. La entrega internacional tarda entre 5 y 14 días hábiles.
Cada máquina (Asics) incluye una fuente de alimentación. Y embalaje original de la empresa.
Bearbeitungs- und Versandzeiten
Alle Bestellungen werden innerhalb von 72 Stunden von unserem Mining Delta France oder Mining Delta China Lager aus versandt. Bei Großbestellungen kann es ein oder zwei Tage dauern, bis das Produkt per (DHL Express / FEDEX Express) versandt wird, nachdem die Zahlung für die gesamte Bestellung eingegangen ist . Internationale Lieferung dauert etwa 5-14 Werktage.
Verpackung
Jede Maschine (Asics) enthält ein Netzteil. und original Firmenverpackung.
Avec le systéme de sécurité est de cryptage SSL
With the security system is SSL encryption
Con el sistema de seguridad es el cifrado SSL
Bei dem Sicherheitssystem handelt es sich um eine SSL-Verschlüsselung